Groupe Renault - 2020 Universal Registration Document

87 GROUPE RENAULT I UNIVERSAL REGISTRATION DOCUMENT 2020 01 RESEARCH AND DEVELOPMENT GROUPE RENAULT GROUPE RENAULT: A COMPANY THAT ACTS RESPONSIBLY CORPORATE GOVERNANCE FINANCIAL STATEMENTS RENAULT AND ITS SHAREHOLDERS ANNUAL GENERAL MEETING OF RENAULT ON APRIL 23, 2021 ADDITIONAL INFORMATION the R&D part of the support plan: eight projects, of which three P were accepted and are funded by ADEME or Bpifrance, and five were rejected during the pre-validation phase by the General Directorate of Enterprises (DGE), which deemed them not priorities, given the other projects submitted by the applicant companies. The themes addressed are power electronics, the greater availability of EV and hybrid technologies, and battery thermal management; eight projects have been submitted as part of a call for P expressions of interest for the modernization of the support plan. Two projects are still under examination as part of the call for projects that followed, and six projects were rejected before submission by the DGE, which deemed them not priorities, given the other projects submitted by the applicant companies. They concern the plants in Le Mans (sustainability of the activity and employment of the Chassis industrial site in Le Mans) and Batilly (project to create a battery assembly activity for electric vehicles). Renault also remains extremely active in its “Investing in the Future Program”. The projects submitted under the Investing in the Future Programs 1 and 2 are still underway. They include: EVAPS: Ecomobility through Autonomous Vehicles in the P Paris-Saclay region; HPP: High-Pressure Pulsed; P COCTEL: development of a hybrid powertrain; P the large-scale project (SAM – Safety and Acceptability of Driving P and Autonomous Mobility: design of high-performance automated systems, functionally safe for autonomous vehicles) on autonomous vehicles, submitted as part of PIA 2, began testing as initially planned, but nevertheless suffered some postponements due to the impossibility of carrying out certain tests in view of the health crisis. Renault’s research costs were €42 million over the project period, while €11 million in French State aid was awarded by ADEME for budgeted activities; in addition, an ANR project from academics was submitted and P accepted in 2020, with Renault’s participation. It is the DeepSee project, which is an artificial intelligence project focused on the study of new artificial neural networks. Managed projects include the following: Project name Description Project start date Project end date Financing programs Business line 5Gcroco Fifth generation cross-border control 01/01/2019 12/31/2021 H2020-ICT-2018-2020 Electronics COCTEL Development of a hybrid powertrain 10/11/2013 05/25/2021 PIA Vehicle of the Future Program Powertrain CONCORDA Preparing European highways for automated driving with appropriate services and connected technologies 10/01/2017 12/31/2020 2016-EU-TM-0327-S New mobility C-ROADS Improvement and extension of knowledge about Car2X 09/01/2016 12/31/2020 CEF New mobility DENSE Development of sensors combining three functions of radars, lidars, and cameras operating in all weather conditions for autonomous vehicles 06/01/2016 02/29/2020 H2020-ECSEL Electronics EAGLE Development of a lean burn gasoline engine with a 50% gasoline engine efficiency target in line with the ICE research road map 10/01/2016 03/31/2020 H2020-GV-02-2016 Powertrain EMPHYSIS Development of a quasi-automated, standardized process for porting models created for digital simulation to embedded codes 12/01/2016 02/28/2021 EUREKA ITEA3 Powertrain EVAPS Developing and testing of autonomous mobility services with electric vehicles 03/01/2017 02/29/2020 PIA2 Road vehicles and Mobility of the Future New mobility HPP HAUTE PRESSION PULSÉE High-Pressure Pulsed: weight-reduction technology that implements development of welding, crimping, magnetic molding and electro-hydraulic molding systems between steel and aluminum 05/20/2017 02/20/2020 PIA Process INCIT-EV Improving the experience of EV users and accelerating the development of electromobility through the roll-out of innovative recharging solutions throughout Europe 01/01/2020 12/31/2023 H2020-LC-GV-2019 New mobility ISA3 Integration of aluminum solutions to lighten cars – Production of aluminum doors 04/01/2020 10/01/2023 CPSP No. 8 Materials L3PILOT Development of a level 3 autonomous vehicle with demo model 09/01/2017 08/31/2021 H2020-ART-02-2016 New mobility SAM EVRA Design of high performance, functionally safe automated systems for autonomous vehicles 10/16/2019 04/15/2023 PIA Autonomous Road Vehicle Experimentation New mobility SAM EVRA (LAB) Evaluation of the management of critical scenarios Social and economic impact studies 10/16/2019 04/15/2023 PIA Autonomous Road Vehicle Experimentation New mobility TORNADO Determine infrastructure requirements for the roll-out of autonomous vehicles Demonstrate public transport for a population living in large/peri-urban areas Understand the needs/expectations of users within the extended boundaries of metropolises 09/01/2017 02/28/2021 FUI 23 New mobility

RkJQdWJsaXNoZXIy NzMxNTcx