The Renault Group site in Meyzieu has two specialties: the design and manufacturing of innovative tooling to meet the needs of the group's factories, the prototype production center, and industrial clients in the region, as well as the assembly and packaging of chassis parts such as rotating components and arms for Master and Trafic vehicles.

  • FOUNDED IN: 1970 (SMV), 1999 (ACI)
  • LEGAL FORM AND CAPITAL OWNERSHIP: Société en Nom Collectif (general partnership) fully owned by ACI
  • ACTIVITY: Tooling, assembly, and packaging of parts
  • WORKFORCE: 106 at December 31, 2024
  • AREA: 10,000 m2 covered
  • CERTIFICATIONS: ISO 14001, ISO 9001, label SMSSCT

Main products

Machining, prototyping, mechanically welded assembly, 3D printing, arm assembly, rotating parts, parts packaging.

PRODUCTION 2024

  • chassis parts: 350,000 units
Usine Meyzieu produits

Environment

As our activity is evolving toward new professions, the respect of the environment and our impacts on it are remaining at the heart of our operations.

Usine Meyzieu environnement

Quality

The evolution of our business leads us to have new customers with a wide variety of parts. The satisfaction of all our internal and external customers remains a strong axis of our daily work.

News

Beyond the chassis section, the Meyzieu site develops Tooling activities, including machining of parts based on blueprints and small series, the design and manufacturing of welded mechanical assemblies,

Usine Meyzieu

Our history

Back to the key dates

  • 1970: creation of the Société Mécanique de Villeurbanne (SMV), Limited Company subsidiary of Renault.
  • 1999: integration of SMV into ACI.
  • 2001: SMV becomes an ACI subsidiary and takes the name of ACI Villeurbanne.
  • 2004: founding of the Chassis Manufacturing department, to oversee production at all the “chassis” sites.
  • 2010: production of components for New Master.
  • 2012: production of  of stub axle carriers for Duster.
  • 2014: production of components for New Trafic.
  • 2015: packaging work boosted and the Lean project launched.
  • 2016: deployment of Lean on packaging.
  • 2017: deployment of Lean on serial activity.
  • 2018: launch of the ACI 2023 project.
  • 2020: opening of the Meyzieu site.
  • 2022: End of the transfer of activities from Villeurbanne to Meyzieu and launch of new commercial and study office activities.
  • 2024: Open House Day in Meyzieu to showcase the Tooling Center of Excellence